Customer line:+86 10 5986 9142

中文

News

Contact Us

  • Contact:MCC OVERSEAS
  • Phone:010-59869198
  • Fax:59869741
  • Address:Address: No. 28, Beijing, Chaoyang District, China
  • Zip Code:100028

Position: News»Company News

MCC Overseas Signed General Contract for Reheating Furnace Project in Serbia

view:198   Date: 2019-01-16

On December 28, 2018, MCC Overseas signed a general contract for reheating furnace with HBIS Group Serbia Iron & Steel d.o.o. Belgrad. MCCO will provide design, supply, installation and commissioning services for the project. Located in the Smederevo Steel Mill of HBIS Group, 45km southeast of Belgrade, capital of Serbia the project aims to build a cold-loaded 260t/h regenerative walking beam furnace and auxiliary systems in the reserved position. The reheating furnace adopts the dual regenerative combustion technology to make full use of the existing blast furnace gas in the steel mill to save energy and increase output.

HBIS Group acquired the Serbian Smederevo Steel Mill on June 30, 2016 and established HBIS Group Serbia Iron & Steel d.o.o. Belgrad to manage the steel mill. The steel mill is currently regarded as a benchmarking cooperation project between China and Serbia, and has received high-level attention from both sides. China’s President Xi Jinping visited the steel mill on June 19, 2016. With a mission to prompt the friendship between China and Serbia, MCCO is inspired by MCC’s spirit "Never delaying and never slacking" and will carefully plan and seriously implement the project to create value for the client.

Signing of this project suggests repeated presence of MCCO in European metallurgical market and the project further increases MCC's business share in the global metallurgical construction market.