Customer line:+86 10 5986 9142

中文

Business

Contact Us

  • Contact:MCC OVERSEAS
  • Phone:010-59869198
  • Fax:59869741
  • Address:Address: No. 28, Beijing, Chaoyang District, China
  • Zip Code:100028

Position: Business

Selangor Tropicana Apartment and Block A、Block B of Office Building ProjectPost date: 2016-01-11View:0

The construction includes an apartment which is 40-floor high and an 18-floor office building. The floor area is 118,000 square meters. Tropicana high-rise apartment project won the gold award of 10th MOSHAPA OSH EXCLLENCE AWARDS.......

Johor Baru Country Garden Golden Bay 3D and 3F Apartment ProjectPost date: 2016-01-11View:0

The construction includes a 15-floor F1 apartment, a 19-floor F2 apartment , a 21-floor F3 apartment , a 28-floor D1 apartment , a 30-floor D2 apartment. The floor area is 150,000 square meters. It started on September 1th, 2014 and lasted for 29 months.......

Johor Baru Paragon Apartment ProjectPost date: 2016-01-11View:0

The construction includes two 33-flour apartments, which flour area is 90,000 square meters . The project is located on the main pass between Malaysia and Singapore .The project started on April 1th, 2014 and lasted for 30 months.......

Kuala Lumpur Sunway VELO 3R1 &3R2 Apartment ProjectPost date: 2016-01-11View:0

The construction includes two 31-floor apartments , which height is 115.789 meters and area is 120,000 square meters. The project started on September ,2014 and lasted 31 months.......

Johor Baru Iskandar Hotel and Seviced Apartment ProjectPost date: 2016-01-11View:0

The construction includes a 35-floor hotel and serviced apartment, which totally has 583 rooms, two 27-floor hotels which totally have 322 rooms and 3-floor Commercial building that has 188 stores. The construction will start on December, 2015 and will last 32 months.......

Kuala Lumpur Manjiale first-phase Apartment ProjectPost date: 2016-01-11View:0

The first phase of the project is the continuing construction of a 32-floor apartment. The floor area of each floor is about 1300 square meters . The construction mainly includes the top structure and decoration engineering of the parking lot, the more than 28- layer str......